Get a service

If you plan to carry out works, a construction permit is required. By 01.01.2020, all documentation required for the construction process shall be circulated only electronically in the construction information system (BIS).

The service installation shall ensure the convenient and rapid preparation, harmonisation and submission of the documentation of the construction plan to the building board, starting from the most appropriate type of construction application (construction application/proof card/explanatory article) and type of construction (construction of new structures, as well as the conversion, restoration, restoration, demolition, positioning of existing structures, change of use. without conversion and preservation) determination until the approval of the intention or, in cases of simplified construction process, approval of an explanatory article and an attestation card.

If you need assistance in performing activities in BISA, use the option to authorise the building specialist to perform activities in BISA with certain rights, such as representing the person as an initiator. The user must be authorized ON BIS public portal.

Process description

  1. Submission OF construction design documentation BIS
    The construction design documentation may be developed by the initiator of the construction plan, which plans to build the building of groups 1 and 2 on its own, and in other cases a certified construction specialist in the relevant field and field. If the intention is to be developed by a building specialist, the notification BIS must be carried out.

    The construction agent BIS in the construction workplace section OF A NEW CONSTRUCTION site must find the appropriate type of construction application (construction application/proof card/explanatory memorandum). If there is no understanding which type of application to choose, “HELP TO SELECT THE TYPE OF CONSTRUCTION APPLICATION” may be used, which will help you to find the most appropriate type of application according to the parameters you enter.

    The following parts shall be completed successively: application, initiators, building information, land information, Participating Participants, Additional information, parts of the Documentation. The responsible authority. An overview of the application. Coordination. “It should be noted that the next section of the application — “Parts of the dossier” may only be added and approved by its certificate by a specific type of activity/sphere certified construction specialist. 'Other parts (Responsible Authority. An overview of the application. (co-ordination) will be able to continue to be completed once the project documentation has been added and approved. Each part of the application will show an indication that it has been completed correctly.

    If you're not sure you can do the BIS yourself, we recommend that you mandate any other trusted person to help you prepare and submit all the necessary documentation.

  2. Issue of building permit/Acceptance OF construction intention BIS
    The building permit issued or the accepted intention is immediately available on THE BIS public portal under THE NOTICES, as well as on the Construction Workplace under MY CONSTRUCTION at the specific file.

    “It should be noted that a (approved) construction permit has been issued does not yet mean that construction works can be started. Works may be commenced after the relevant decision has been taken and a note of the fulfilment of the conditions has been made. '

    In the issued construction permit, the building board has indicated what design conditions and conditions for starting construction are required for you to fulfil as the construction agent. Chapter 5 of the building statements determines the measures to be taken to inform the public, for example, in which cases a building project should be deployed.

    It should be noted that each local government has binding rules containing information on intended duties on the issue of a construction permit or the acceptance of a construction plan, by making a note in an explanatory article or a proof card.

Payments

PositionPrice
0.00 EUR
0.00 EUR
0.00 EUR
200.00 EUR
70.00 EUR
30.00 EUR
10.00 EUR
30.00 EUR
30.00 EUR
0.00 EUR
0.00 EUR
0.00 EUR
0.00 EUR